Question: Create a Work Breakdown Schedule (WBS) illustrating how someone might design and build a house. Level 1 should be the: Completed House Level 2 should
Create a Work Breakdown Schedule (WBS) illustrating how someone might design and build a house.
Level 1 should be the: Completed House
Level 2 should include at least six (6) major tasks: For instance, Architect design, Construction, Turnover
Level 3 should include at least four (4) key tasks for each level 2 item.
For example, Turnover might include 1) walk through with customer, 2) punch list, 3) punch list resolution, and 4) Closing