Question: Create a Work Breakdown Structure using the indented outline structure with numbering shown in Wysocki Figure 7.6 that completely breaks down the tasks described



Create a Work Breakdown Structure using the indented outline structure with numbering shown in Wysocki Figure 7.6 that completely breaks down the tasks described in this flow chart, contains only elements that are appropriate to the WBS, does not introduce any tasks that are not included in the flow chart, and uses an organizational approach. Include any assumptions you are making as a separate section of your response. 1. SITE PREPARATION 1.1. 1.2. 1.3. 2. FOUNDATION 2.1. Layout Grading Excavation Erect Forms 2.2. 2.3. 3. FRAMING 3.1. Pour Concrete Remove Forms Floor Joists 3.1.1. Install first floor joists 3.1.2. Install second floor joists 3.2. Subflooring 3.2.1. Install first floor subflooring 3.2.2. Install second floor subflooring Erect first floor stud walls 3.3. Stud Walls 3.3.1. 3.3.2. 3.4. Frame the roof etc. Erect second floor stud walls Figure 7.6: Indented outline WBS for a house PRODUCTION AND QUALITY CONTROL SYSTEM FLOW Exploration Clients The requirement of the order Communication with the clients Ordered before Order evaluation procedure Order information Confirmation on the requirement Designing of the exploration Contract signature Purchase planning Manufacturing preparation (enter the procedure of ERP) Manufacture programming Metal shearing, bending Metal stamping Purchase implement NO Program making Check and inspection Metal forming Booking in Matching section backup Metal welding Checking in the program for the new exploration New design drawing Design making PPT Checking and inspection Designing evaluation After sales service Designing conformation and documentation Sample prove by the client Sample making Identify the defeat goods situation Replace, if could not be repair Repair, if the client agree Simi-finished product booking in warehouse Surface treatment etc. Need to be made by contract co-partner. Checking and inspection the scheme solution be agreed by the client Hardware assemblying line and pacing in warehouse Finishing products booking in warehouse NO Inspection order by the clients Checking and inspection Goods delivery
Step by Step Solution
There are 3 Steps involved in it
Work Breakdown Structure WBS for Production and Quality Control System 1 Order Management 11 The Req... View full answer
Get step-by-step solutions from verified subject matter experts