Question: Create Work Breakdown Structure (WBS) Include at least 3 levels, i.e., the Project plus two additional levels. Include at least 15 work packages. Consider all

Create Work Breakdown Structure (WBS)

  • Include at least 3 levels, i.e., the Project plus two additional levels.
  • Include at least 15 work packages.
  • Consider all of the deliverables that are required to reach to Canada for higher studies (such as visa applications, completed travel documents, travel plans, accommodations, etc.)
  • Break high-level deliverables into smaller deliverables, with the smallest being referred to as work packages