Question: Create Work Breakdown Structure (WBS) Include at least three levels, i.e., the Project plus two additional levels. Include at least 15 work packages. Consider all
Create Work Breakdown Structure (WBS)
- Include at least three levels, i.e., the Project plus two additional levels.
- Include at least 15 work packages.
- Consider all of the deliverables that are required to reach to Canada for higher studies (such as visa applications, completed travel documents, travel plans, accommodations, etc.)
- Break high-level deliverables into smaller deliverables, with the smallest being referred to as work packages