DataSpan, Incorporated, automated its plant at the start of the current year and installed a flexible...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
DataSpan, Incorporated, automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Throughput time (days) Delivery cycle time (days) Manufacturing cycle efficiency (MCE) Percentage of on-time deliveries Total sales (units) Month 1 2 3 4 ? ? ? ? ? ? ? ? ? ? ? ? 76% 3050 72% 69% 66% 2919 2770 2666 Management has asked for your help in computing throughput time, delivery cycle time, and MCE. The following average times have been logged over the last four months: Average per Month (in days) 1 2 3 4 Move time per unit 0.9 0.7 0.9 0.9 Process time per unit 2.3 2.2 2.1 2.0 Wait time per order before start of production Queue time per unit 19.0 20.8 23.0 24.8 4.5 5.2 6.0 6.9 Inspection time per unit 0.4 0.5 0.5 0.4 Required: 1-a. Compute the throughput time for each month. 1-b. Compute the delivery cycle time for each month. 1-c. Compute the manufacturing cycle efficiency (MCE) for each month. 2. Evaluate the company's performance over the last four months. 3-a. Refer to the move time, process time, and so forth, given for month 4. Assume that in month 5 the move time, process time, and so forth, are the same as in month 4, except that through the use of Lean Production the company is able to completely eliminate the queue time during production. Compute the new throughput time and MCE. Check DataSpan, Incorporated, automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been encountered, including problems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four months of operations. Throughput time (days) Delivery cycle time (days) Manufacturing cycle efficiency (MCE) Percentage of on-time deliveries Total sales (units) Month 1 2 3 4 ? ? ? ? ? ? ? ? ? ? ? ? 76% 3050 72% 69% 66% 2919 2770 2666 Management has asked for your help in computing throughput time, delivery cycle time, and MCE. The following average times have been logged over the last four months: Average per Month (in days) 1 2 3 4 Move time per unit 0.9 0.7 0.9 0.9 Process time per unit 2.3 2.2 2.1 2.0 Wait time per order before start of production Queue time per unit 19.0 20.8 23.0 24.8 4.5 5.2 6.0 6.9 Inspection time per unit 0.4 0.5 0.5 0.4 Required: 1-a. Compute the throughput time for each month. 1-b. Compute the delivery cycle time for each month. 1-c. Compute the manufacturing cycle efficiency (MCE) for each month. 2. Evaluate the company's performance over the last four months. 3-a. Refer to the move time, process time, and so forth, given for month 4. Assume that in month 5 the move time, process time, and so forth, are the same as in month 4, except that through the use of Lean Production the company is able to completely eliminate the queue time during production. Compute the new throughput time and MCE. Check
Expert Answer:
Related Book For
Managerial Accounting
ISBN: 978-0697789938
13th Edition
Authors: Ray H. Garrison, Eric W. Noreen, Peter C. Brewer
Posted Date:
Students also viewed these accounting questions
-
Measures of Internal Business Process Performance DataSpan, Inc., automated its plant at the start of the current year and installed a flexible manufacturing system. The company is also evaluating...
-
A SQL With respect to database transaction, the ACID concepts should apply! ACID is an acronym for atomicity, consistency, isolation and durability. Please define each of these terms in your own...
-
What do you see as being the major advantages and disadvantages to both the company and the staff of adopting the Annual Hours Work Plan?
-
Go to a website for all U.S. lotteries and study the summary of state and multistate lottery odds and prizes. Pick five lotteries and determine the expected value for winnings in each case. Discuss...
-
Redesign the fractionator of Example 6.8 for a reflux ratio that is twice the minimum. Determine the diameter of the tower, the height of packing in the stripping and rectifying sections, and the...
-
Aire-Co produces home dehumidifiers at two different plants in Atlanta and Phoenix. The per unit cost of production in Atlanta and Phoenix is $400 and $360, respectively. Each plant can produce a...
-
During the early 19th century, the Springfield (Massachu-setts) Armory provided a good example of: an increasing division of labor accounting techniques for wage payments and control of time and...
-
Provide two or three examples each of activities that you believe could thrive under production-centered management or proceed most appropriately under people-centered management. Are these related...
-
What is the output of the following code: var1=4 echo 'var1=\$var1'
-
Find the derivative of the function: f(x) = -4e-11x
-
What is the output of this code? (setf a 0) (defun fun (n) (if (= n 0) (setf a (+a n)) (progn (setf a (+ a n)) (fun (- n 1) ) ) ) ) (fun 4) (print a)
-
What is output of below code ? let count=0; (function() { if (count === 0) { let count = 1; } console.log(count); console.log(count); })();
-
What is the output of the following code? #include using namespace std; void FillArray(int a[]; int aSize) { for (int i = 0; i
-
Jackson has $10, which he plans to allocate among three rides at the amusement park. Each ride on the Roller Coaster costs $3.00, on the Bumper Cars, $2.00, and on Splatter Mountain, $1.00. The Table...
-
Explain the circumstances that could result in a long-term bank loan being shown in a statement of financial position as a current liability.
-
Imperial Jewelers is considering a special order for 20 handcrafted gold bracelets to be given as gifts to members of a wedding party. The normal selling price of a gold bracelet is $189.95 and its...
-
Following are a number of cost terms introduced in the chapter: Variable cost......................... Product cost Fixed cost............................... Sunk cost Prime...
-
Olongapo Sports Corporation is the distributor in the Philippines of two premium golf ballsthe Flight Dynamic and the Sure Shot. Monthly sales, expressed in pesos (P), and the contribution margin...
-
Suppose that there is an upward shift in the expected rate of return on the risky asset, from 15% to 17%. If all other parameters remain unchanged, what will be the slope of the CAL for y 1 and y >...
-
a. If an investors coefficient of risk aversion is A = 3, how does the optimal asset mix change? What are the new values of E(rC) and C? b. Suppose that the borrowing rate, r fB = 9%, is greater than...
-
Comparing your answer to Problem 6, what do you conclude? Problem 6, Draw the indifference curve in the expected returnstandard deviation plane corresponding to a utility level of .05 for an investor...
Study smarter with the SolutionInn App