Question: DEIALS ANU SPECIFICATIONE Foundatio ( n ) / ( W ) all - Canada Mortgage and Housing Corporation ( CMHC ) Foundatio ( n )
DEIALS ANU SPECIFICATIONE FoundationWall Canada Mortgage and Housing Corporation CMHC FoundationWall Canada Mortgage and Housing Corporation CMIIC Designer Checklist A continuous flashing with a dripedge projection is specified. Builder Checklist Joints in the flashing are lapped at least mm in sealed and, in the case of membrane flashings, free of fish mouths. Flashings are sealed to the substrate. If flexible membrane flashing is used without a metal drip edge. exposed edges are not cut off. The inslallation of flashings, airvapour barrier membrane and insulation is coordinated with masonry work. Before foundation layout is finished, the foundation alignment in the plan and the elevation is coordinated with veneer location and satisfies construction tolerance requirements for CSA masonry and concrete standards. Maximum brick corbel is one third the thickness of the brick. Morlar joints are tooled on the exterior side of the brick veneer to provide a concave joint. Weep holes extend through the head joint and bed joint. Mortar joints are flush on the outside face of concrete block to provide a level surface for installing the airfvapour barrier membrane. All penetrations of the airvapour barrier membrane are sealed. The insulation is securefy in contact with the backup wall. End dams are provided at changes in the wall assembly and the ends of the flashing are turned up and watertight. The air space is reasonably clear of mortar droppings. Mechanical fasteners for irsulation are installed at minimum spacing of one every mm in The airvapour barrier membrane overlaps the throughwall flashing atBCIT: Architectural & Building Technology
Course: BLDC Materials and Materials
Building Technology BVSS
DETAILS AND SPECIFICATION: On the sketch, show the path of water within the wall system and how it would exit
the cavity.
Please use a color other than black. Indicate the direction of flow for the water.
What is the recommended spacing for weep holes vent holes in the brick veneer? Why
is this different from the required spacing?
Identify one method of mechanically attaching and one method of supporting the
brick veneer to the structure.
Why are both metal and flexible flashings used at the base of the brick veneer? Why
is it important that the flexible flashing overlap the metal?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock