Question: Design a forming system for the elevated slab as shown in the following sketches. The concrete will be normal weight ( 1 5 0 pcf

Design a forming system for the elevated slab as shown in the following sketches. The concrete will be normal weight (150pcf) and will be placed using buggies. The following materials are available. The estimated weight of the form system is 15 psf. Clear space between floors is 11 ft(this is height from top of slab of lower floor to bottom of slab of upper floor). Draw a sketch of the final design.Use: 2X8 Douglas Fir-Larch (North) #1&Btr for joists 4X8 Douglas Fir- Larch (North) #1&Btr for stringers in B-B plyform Class I For shoring solve in two ways:o WACO Standard post shoreso 4x4 Douglas Fir- Larch (North) #1&Btr members Head plate for shores: 6x6. Use same for steel and wood shoring Base plate for shores: 8x8. Leave 4 space between centerline of stringers and shores and edge of slab to accommodate for head plates. Head plates and base plates are 1 thick.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!