Question: Q3 A simple house project can be structured as follows (8 Work Packages total): Design: Ground plans + External design . Structure: Excavation +
Q3 A simple house project can be structured as follows (8 Work Packages total): Design: Ground plans + External design . Structure: Excavation + Foundation + Roof + Frame Services: Electricity + Plumbing + HVAC Use the following numbering system: '1' for the top level 1.1' onwards for the second level . 1.1.1' onwards for the third level Create the Work Breakdown Structure (WBS) of the project described above.
Step by Step Solution
There are 3 Steps involved in it
TopLevel Structure 1 House Project SecondLevel Structure 11 Design 12 Structure 13 Services Third... View full answer