Question: ? ? Determine the desirable cycle length for the intersection shown below ( 7 p t s . The intersection is designed to have the
Determine the desirable cycle length for the intersection shown below The intersection is designed to have the following three phases:
Phase A: leftturn movements from the East and West Bound approaches;
Phase B: through and right movements from East and West Bound approaches;
Phase C: all movements from the North and South Bound approaches.
Assume that each intersection approach has three lanes, one for the leftturning vehicles, one for the through vehicles, and one for the rightturn vehicles. The saturation discharge headway is equal to seconds, the lots timephase is the peak hour factor is and the volumetocapacity ratio does not exceed
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
