Question: ? ? Determine the desirable cycle length for the intersection shown below ( 7 p t s . The intersection is designed to have the

??Determine the desirable cycle length for the intersection shown below (7pts. The intersection is designed to have the following three phases:
Phase A: left-turn movements from the East and West Bound approaches;
Phase B: through and right movements from East and West Bound approaches;
Phase C: all movements from the North and South Bound approaches.
Assume that each intersection approach has three lanes, one for the left-turning vehicles, one for the through vehicles, and one for the right-turn vehicles. The saturation discharge headway is equal to 2.1 seconds, the lots time/phase is 3.5s, the peak hour factor is 0.92 and the volume-to-capacity ratio does not exceed 0.85.
? ? Determine the desirable cycle length for the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!