Question: Determine the drawdown in a 3 0 5 mm diameter well installed in an unconfined aquifer after pumping for 9 0 days at a rate

Determine the drawdown in a 305 mm diameter well installed in an unconfined aquifer after pumping for 90 days at a rate of 300 gpm. The aquifer has a saturated thickness of 12.2 m, a storage coefficient of 0.12, and a hydraulic conductivity of 45.7 m/day.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!