Question: Determine the maximum possible crash time for the network, and crash the network the maximum amount possible. Develop a mathematical model to optimize crashing. The

Determine the maximum possible crash time for the

  1. Determine the maximum possible crash time for the network, and crash the network the maximum amount possible.
  2. Develop a mathematical model to optimize crashing.
The following table provides the information necessary to construct a project network and project crash data: Activity Activity Activity Activity Time (weeks) Cost ($) Predecessor Normal Crash Normal Crash 1 20 8 1000 1480 2 24 20 1200 1400 3 14 7 700 1190 4 1 10 6 500 820 5 3 11 5 550 730 a. Determine the maximum possible crash time for the network, and crash the network the maxi- mum amount possible. b. Develop a mathematical model to optimize crashing.|

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!