Question: Determine the total cycle time for a single - engine scraper rated at 2 0 cy heaped, which is used to haul material from a
Determine the total cycle time for a singleengine scraper rated at cy heaped, which is used to haul material from a pit to a fill ft away. The average haul speed will be mph and the average return speed will be mph Allow ft for required acceleration and decceleration. Asuume a load time of min. NOTE: You have enough information don't need RR haul road condition, or type of material.. because the scraper's speeds are given.