Question: Determining Job Costs, Using the ABC Method Job 19AB required $10,000 for direct materials, $4,000 for direct labor, 30o direct labor hours. 1 overhead rates

 Determining Job Costs, Using the ABC Method Job 19AB required $10,000

Determining Job Costs, Using the ABC Method Job 19AB required $10,000 for direct materials, $4,000 for direct labor, 30o direct labor hours. 1 overhead rates for each pool follow: Cost Pool Direct labor support Machining support Material movement $10/direct labor hour $350/material move Check My Work (3 remair