Question: Determining Job Costs, Using the ABC Method Job 2 5 AX required $ 5 , 0 0 0 for direct materials, $ 2 , 0

Determining Job Costs, Using the ABC Method
Job 25AX required $5,000 for direct materials, $2,000 for direct labor, 200 direct labor hours, 100 machine hours, two setups, and three design changes. The cost pools and overhead rates for each pool follow:
Cost Pool
Assembly support Machine support Machine setups Design changes
Overhead Rate
$5/direct labor hour $10/machine hour $250/setup $500/design change
Determine the cost of Job 25AX using the ABC method. $ QUESTION 9