Question: Develop a Value Stream Map based on the process steps and average lead time in Table 2: Process Baseline Measurement within this case study; include
Develop a Value Stream Map based on the process steps and average lead time in Table 2: Process Baseline Measurement within this case study; include all relevant elements included in the MEASURE module. Generate your own VSM based on the VSM Tools elements discussed during our MEASURE session.

Baseline Assumptions:
- There is 100 referral records of inventory prior "Time Between referred and letter"
- Document any assumptions
- Determine the following KPIs:
- PLT
- PCE
- ALT
- Bonus
- Takt Time for a demand of 1,000 referrals/year