Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical...
Fantastic news! We've Found the answer you've been seeking!
Question:
![image text in transcribed](https://s3.amazonaws.com/si.experts.images/answers/2024/05/6648df8910b62_8486648df889d55c.jpg)
Transcribed Image Text:
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 70,000 units of product were as follows: Standard Costs 196,000 lbs. at $4.70 17,500 hrs. at $17.90 Actual Costs 194,000 lbs. at $4.50 Direct materials Direct labor Factory overhead 17,900 hrs. at $18.10 Rates per direct labor hr, based on 100% of normal capacity of 18,260 direct labor hrs.: Variable cost, $2.80 Fixed cost, $4.40 $48,510 variable cost $80,344 fixed cost Each unit requires 0.25 hour of direct labor. Required: a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Direct Materials Price Variance Direct Materials Quantity Variance Total Direct Materials Cost Variance b. Determine the direct labor rate vanance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Direct Labor Rate Variance Direct Labor Time Variance Total Direct Labor Cost Variance c. Determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number Variable factory overhead controllable variance Fixed factory overhead volume variance Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 70,000 units of product were as follows: Standard Costs 196,000 lbs. at $4.70 17,500 hrs. at $17.90 Actual Costs 194,000 lbs. at $4.50 Direct materials Direct labor Factory overhead 17,900 hrs. at $18.10 Rates per direct labor hr, based on 100% of normal capacity of 18,260 direct labor hrs.: Variable cost, $2.80 Fixed cost, $4.40 $48,510 variable cost $80,344 fixed cost Each unit requires 0.25 hour of direct labor. Required: a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Direct Materials Price Variance Direct Materials Quantity Variance Total Direct Materials Cost Variance b. Determine the direct labor rate vanance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Direct Labor Rate Variance Direct Labor Time Variance Total Direct Labor Cost Variance c. Determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number Variable factory overhead controllable variance Fixed factory overhead volume variance
Expert Answer:
Posted Date:
Students also viewed these accounting questions
-
Rachael Ray Corporation had the following transactions. 1. Sold land (cost $12,000) for $15,000. 2. Issued common stock for $20,000. 3. Recorded depreciation of $17,000. 4. Paid salaries of $9,000....
-
Dorsey Co. has expanded its operations by purchasing a parcel of land with a building on it from Bibb Co. for $90,000. The appraised value of the land is $20,000, and the appraised value of the...
-
An oil pump is drawing 44 kW of electric power while pumping oil with r 5 860 kg/m3 at a rate of 0.1 m3/s. The inlet and outlet diameters of the pipe are 8 cm and 12 cm, respectively. If the pressure...
-
PhotoMax, Inc., plans to prepare a sales budget schedule and a purchases budget schedule for 20X3. Management has set a sales goal of 250,000 units. After reviewing price trends, the sales manager...
-
For the year ending March 31, 20Y5, Omega Systems Inc. reported net income of $105,450 and paid dividends of $7,500. Comparative balance sheets as of March 31, 20Y5 and 20Y4, are as follows:...
-
A BA is documenting their analysis and design experience. Which task covers the question, "What was expected to be delivered?"
-
15. The ANOVA summary table for an experiment with five groups, with nine values in each group, is shown to the right. Complete parts (a) through (d) below. Click here to view page 1 of the F table.1...
-
The probability of rain on any day in the month of April is 2 8 % . The probability that will be windy on any day in the month of April is and the probability of both is 1 5 % . What is the...
-
Assume that over the past 4 years Joe Corp. stock has earned returns of 30%, 2%, 22%, and 10%. Set up the calculations needed to determine the standard deviations of returns on Joe.
-
Evaluate the iterated integral So L 3 3y xy dx dy. 0 y Answer:
-
McBain Tower In this scenario, the business would exercise the option of breaking its current lease for a penalty of $300,000. It would then relocate to a five-story space within McBain Tower. Since...
-
A debt to equity ratio of 50% indicates that half of the company\'s assets are financed through equity, 50% of the company\'s interest expense comes from long-term debt financing, the company is...
-
The support bracket shown in the diagram below is designed to carry a load P , 100 mm from the centreline of the bolt pattern. The support bracket is attached to a structural steel column of...
-
If the jobs displayed in Table 18.24 are processed using the earliestdue-date rule, what would be the lateness of job C? TABLE 18.24 Processing Times and Due Dates for Five Jobs Job C D E...
-
A cost sheet and partial finished goods ledger card for Leather Originals, a manufacturer of leather furniture, are provided in the Working Papers. Work independently to complete the following...
-
Krasnoy Tire, a maker of tires for cars, trucks, and tractors, is trying to determine how to account for various factory costs. The costs include the following: a. Wages earned by a factory...
-
Wilmington, Inc., manufactures heating systems. The company maintains a materials ledger for all direct materials. Instructions: 1. Prepare a materials ledger card for T-5 thermostats. The thermostat...
![Mobile App Logo](https://dsd5zvtm8ll6.cloudfront.net/includes/images/mobile/finalLogo.png)
Study smarter with the SolutionInn App