Question: DMAIC stands for ______ a) Do-Measure-Act-Implement-Check b) Define-Measure-Act-Implement-Control c) Define-Measure-Analyze-Improve-Control d) Do-Measure-Analyze-Improve-Control 2. What DMAIC process does is, to _______ a) Manufacture any product b)
DMAIC stands for ______
a) Do-Measure-Act-Implement-Check
b) Define-Measure-Act-Implement-Control
c) Define-Measure-Analyze-Improve-Control
d) Do-Measure-Analyze-Improve-Control
2. What DMAIC process does is, to _______
a) Manufacture any product
b) Define specification limits for a product
c) Solve root cause of quality and process problems
d) Define quality system standards
3. Which of these is not a part of the Define step of DMAIC process?
a) Verify and gain approval for final solutions
b) Define critical customer requirements
c) Establish project charter and build team
d) Document process
4. DMAIC is often associated with ______
a) Six-sigma activities
b) Kaizen board
c) 5-s
d) Acceptance sampling
5. PSP is expanded as ____
a) Problem Solving Process
b) Product safeguarding process
c) Product Sampling Process
d) Project Settling Procedure
6. The Cause and Defect Diagram is a part of _____ step of DMAIC process.
a) Define
b) Analyze
c) Control
d) Measure
7. Tollgate reviews are presented to managers and "owner" of a process __________ in the six-sigma organizations.
a) The project champions and the black belts not working directly on the project
b) Industrial engineering team
c) Quality control manager
d) Developers of the factory
8. Improve step of DMAIC can also be changed by Design step in the case of some processes.
a) True
b) False
9. DFSS refers to _____
a) Development of Six-Sigma
b) Design for Six-Sigma
c) Define for Six-Sigma
d) Development for Six-Sigma
Step by Step Solution
There are 3 Steps involved in it
Sure Here are the answers to the questions provided DMAIC stands for c DefineMeasureAnalyzeI... View full answer
Get step-by-step solutions from verified subject matter experts
