Question: do all problem 5 Problem 5(4.9pt) Consider the assembly line halancing problem shown in the network helow. The demand is 64 units per day, and

do all problem 5 Problem 5(4.9pt) Consider the
do all problem 5 Problem 5(4.9pt) Consider the
do all problem 5 Problem 5(4.9pt) Consider the
do all problem 5
Problem 5(4.9pt) Consider the assembly line halancing problem shown in the network helow. The demand is 64 units per day, and the productive time is 960 minutes per day. Use the pocitional weight ranking method to complete the line balancing in this probleit. (5a) Determine the takt time. (5b) Calculate the positional weight for all tasks. (5c) Determine a line balance using the takt time as the cycle time. Giele the Wertstereat (5d) The workstation utilization rate for Part 5c is: (5e) The fotal idle time for Part 5e is: bhe ball thee 3+5+7=15mn (5f) The production rafe for Part 5c is: (5h) The workstation utilization rate for Part 5g is: utilization rate, Actentwsmin50=84 xiou =50% (5i) The total idle time for Part 5g is: Grat inle fine: 5+3+2+1+3+4+2=20 mis (5j) The production rate for Part 5g is

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!