Question: do - noting alternative is associated with a fatal accident cost of $ 2 . 8 million per year. An improvement project can reduce the

do-noting alternative is associated with a fatal accident cost of $2.8 million per year.
An improvement project can reduce the fatal accident cost by 40%. The improvement investment cost is $12 million. Is the improvement feasible considering 5% annual interest rate, and 30- year analysis period?
Determine the annual VOC associated with reducing the speed on a highway section from
60 to 40 mph considering ADT =50,000 vpd,10% SUT, and 5% combination trucks.
A 3-lane approach with 80% of traffic is expected to experience stopping, 45 mph approach speed, 450 vphpl service volume, 10% SUT, and 5% combination trucks.
Determine: a- The annual stopping cost. b-The lane capacity (vphpl) assuming 0.6 green time ratio. HW \#1
1- The do-noting alternative is associated with a fatal accident cost of \(\$ 2.8\) million per year. An improvement project can reduce the fatal accident cost by \(40\%\). The improvement investment cost is \(\$ 12\) million. Is the improvement feasible considering \(5\%\) annual interest rate, and 30- year analysis period?
2- Determine the annual VOC associated with reducing the speed on a highway section from 60 to 40 mph considering \(\mathrm{ADT}=50,000\mathrm{vpd},10\%\) SUT, and \(5\%\) combination trucks.
3- A 3-lane approach with \(80\%\) of traffic is expected to experience stopping, 45 mph approach speed, 450 vphpl service volume, \(10\%\) SUT, and \(5\%\) combination trucks. Determine: a- The annual stopping cost. b-The lane capacity ( vphpl ) assuming 0.6 green time ratio.
do - noting alternative is associated with a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!