Question: Draw a cost-time graph and plot the indirect cost line. Sequentially crash the time units down to 16 to calculate the direct cost. Plot the
Draw a cost-time graph and plot the indirect cost line. Sequentially crash the time units down to 16 to calculate the direct cost. Plot the direct cost on the graph and calculate the total cost. Identify the optimum time-cost schedule and the optimum cost. 