Question: Draw network diagram and all possible paths and slacks Task Predecessor(s) Duration (weeks) A None 2 B A 10 C A 7 D B 8
Draw network diagram and all possible paths and slacks
| Task | Predecessor(s) | Duration (weeks) |
| A | None | 2 |
| B | A | 10 |
| C | A | 7 |
| D | B | 8 |
| E | C | 10 |
| F | D, E | 1 |