Question: Draw the AON network for Milwaukee paper, using the data in Example 1 nagem... 107 / 918 - 100% + Example 1 PREDECESSOR RELATIONSHIPS FOR
Draw the AON network for Milwaukee paper, using the data in Example 1
nagem... 107 / 918 - 100% + Example 1 PREDECESSOR RELATIONSHIPS FOR POLLUTION CONTROL AT MILWAUKEE PAPER Milwaukee Paper Manufacturing had long delayed the expense of installing advanced computerized air pollution control equipment in its facility. But when the board of directors adopted a new proactive policy on sustainability, it did not just authorize the budget for the state-of-the-art equipment. It directed the plant manager, Julie Ann Williams, to complete the installation in time for a major announcement of the policy on Earth Day, exactly 16 weeks away! Under strict deadline from her bosses, Williams needs to be sure that installation of the filtering system progresses smoothly and on time Given the following information, develop a table showing activity precedence relationships APPROACH Milwaukee Paper has identified the eight activities that need to be performed in order for the project to be completed. When the project begins, two activities can be simultaneously started building the internal components for the device activity A) and the modifications necessary for the floor and roof (activity B). The construction of the collection stack (activity C) can begin when 1 CHAPTER 3 PROJECT MANAGEMENT 69 the internal components are completed Pouring the concefloor and installation of the react It can be started as soon as the internal components acted and the roof door been modified After the collection stack has been constructie can be dhe Hebu city and installere ested active after the context menu the high-meratureconly the find tot die wortel und tutti SOLUTION Advandre w there will then the What du Likewise bo priority SOLUTION Activities and precedence relationships may seem rather confusing when they are pre- sented in this descriptive form. It is therefore convenient to list all the activity information in a table, as shown in Table 3.1. We see in the table that activity A is listed as an immediate predecessor of activity C Likewise, both activities and must be performed prior to starting activity.G. TABLE 3.1 Milwaukee Paper Manufacturing's Activities and Predecessors ACTIVITY DESCRIPTION IMMEDIATE PREDECESSORS Buldintemal components B Modity roof and floor Construct Colledion stack Pour conote and intrare AB Reperatuur Installation Control Install or pollution device H Insect and INSICHTo complete work all predecesion mot be catly defined LEARNING EXERCISE What is the limpact on this one of active comentato Lion Away) approval required after her the mediante padecer the new activity would help with the lot divity Activity-on-Node Example Note that imple we only in the ind predictor orcach activity or indice in Table 3.1. bused Aprontity and activity provedsty the that activity Antecedes activity in this roloshimacdotle pictly 70 PART 1 INTRODUCTION TO OPERATIONS MANAGEMENT Example 2 AON GRAPH FOR MILWAUKEE PAPER Draw the AON network for Milwaukee Paper, using the data in Example 1, APPROACH In the AON approach, ve denotetach activity by a node. The lines of arrows, septo sent the precedence relationship between the activities SOLUTION In this example, there are two activities and B) that do not have any peodectors We draw separate modes for each orihese act as shown in Figure 5. Although not required tally convenient to have a unique starting activity for a project. We have therefore included de called Surin S. This dummy activity does not really and takes up to time and resources Activity Sian mediale predecessor for both civitand and serves as the unique starting activity for the entire Dummy activity Figure 3.5 Beginning AON Network for Milwaukee Paper Activity Component Sunt ST Ac Avily Wood Web from the WS


Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock