Question: E4-12 Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3,4-4, 4-5, 4-6] Bunker makes two types of briefcase, fabric and leather. The company is

 E4-12 Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3,4-4,4-5, 4-6] Bunker makes two types of briefcase, fabric and leather. The

E4-12 Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3,4-4, 4-5, 4-6] Bunker makes two types of briefcase, fabric and leather. The company is currently using a traditional costing system with labor hours as the cost driver but is considering switching to an activity-based costing system. In preparation for the possible switch, Bunker has identified two activity cost pools: materials handling and setup. Pertinent data follow: Number of labor hours Number of material moves Number of setups Fabric Case 21,000 630 35 Leather Case 11,000 1,170 175 Total estimated overhead costs are $282,300, of which $234,000 is assigned to the materials handling cost pool and $48,300 is assigned to the setup cost pool Required: 1. Calculate the overhead assigned to the fabric case using the traditional costing system based on direct labor hours. (Do not round intermediate calculations and round your final answer to the nearest whole dollar amount.) Overhead Assigned 2. Calculate the overhead assigned to the fabric case using ABC. (Round activity rates or activity proportions, and intermediate calculations to four decimal places.) Overhead Assigned

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!