Question: Electric E supplies power to a large plant through a number of electric generators. The company is concerned with generator failures as a breakdown
Electric E supplies power to a large plant through a number of electric generators. The company is concerned with generator failures as a breakdown costs $75 per generator per hour. Maintenance technicians work rotating 8-hour shifts (the company therefore runs 24 hours a day). Management wants to determine the machine breakdown cost, for a simulation of 10 breakdowns. 5.1 Complete the tables below. Time between Number of times machine failures observed (hrs) 0.5 1 1.5 2 2.5 3 TOTAL Repair time required (hrs) 1 2 3 TOTAL 5 6 16 33 21 Random numbers: Breakdowns: 57 Repair time: 7 19 Number of times observed 28 52 20 17 60 36 77 Probability Probability 72 49 Cumulative probability Random No. intervals Cumulative Random No. probability intervals 85 31 76 95 44 51 30 16 26 14 9 85
Step by Step Solution
3.31 Rating (160 Votes )
There are 3 Steps involved in it
Solution To complete the tables ... View full answer
Get step-by-step solutions from verified subject matter experts