Question: Use the risk matrix below and probability figures for the situation: An organisation has Oil Ring Main Unit switchgear that has been poorly maintained due

Use the risk matrix below and probability figures for the situation:

  • An organisation has Oil Ring Main Unit switchgear that has been poorly maintained due to lack of spares and has a probability of failure during operation of 1 in 100. 
  • The switchgear is only operated occasionally (on average once a year). 
  • The operation is manual with the operator standing in front of the switchgear. 
  • The consequence of the switchgear failure is explosion of the tank, arc fault, projectiles, oil spillage and possible fire.
  • The cost to replace the switchgear is estimated to be $100,000. 

 

  1. Determine the risk level (low/medium / high / very high). 
  2. Indicate whether proactive replacement of this switchgear before failure occurs is preferred or not. 
  3. State any assumptions made for the basis of your determination.

 

Probability:

  • Almost certain – 1 in 10
  • Likely – 1 in 100
  • Possible – 1 in 1000
  • Unlikely – 1 in 10000
  • Rare – 1 in 1000000

Step by Step Solution

3.42 Rating (152 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!