Question: Use the risk matrix below and probability figures for the situation: An organisation has Oil Ring Main Unit switchgear that has been poorly maintained due
Use the risk matrix below and probability figures for the situation:
- An organisation has Oil Ring Main Unit switchgear that has been poorly maintained due to lack of spares and has a probability of failure during operation of 1 in 100.
- The switchgear is only operated occasionally (on average once a year).
- The operation is manual with the operator standing in front of the switchgear.
- The consequence of the switchgear failure is explosion of the tank, arc fault, projectiles, oil spillage and possible fire.
- The cost to replace the switchgear is estimated to be $100,000.
- Determine the risk level (low/medium / high / very high).
- Indicate whether proactive replacement of this switchgear before failure occurs is preferred or not.
- State any assumptions made for the basis of your determination.
Probability:
- Almost certain – 1 in 10
- Likely – 1 in 100
- Possible – 1 in 1000
- Unlikely – 1 in 10000
- Rare – 1 in 1000000