Question: Engineering economy Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each. Either design will serve
Engineering economy Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each. Either design will serve equally well and will involve the same material and manufacturing cost except for the lathe and drill operations. Design A will require 12 hours of lathe time and 5 hours of drill time per 1, 000 units. Design B will require 7 hours of lathe time and 8 hours of drill time per 1, 000 units. The variable operating cost of the lathe, including labor, is $18.60 per hour. The variable operating cost of the drill, including labor, is $16.90 per hour. Finally, there is a sunk cost of $5, 000 for Design A and $9, 000 for Design B due to obsolete tooling. Which design should be adopted if 125, 000 units are sold each year
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
