Question: Show your complete solution. B. Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each. Either

Show your complete solution.

Show your complete solution. B. Two alternative designs are under consideration for

B. Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each. Either design will serve equally well and will involve the same material and manufacturing cost except for the lathe and drill operations. Design A will require 6 hours of lathe time and 4.5 hours of drill time per 1,000 units. Design B will require 7 hours of lathe time and 12 hours of drill time per 1,000 units. The variable operating cost of the lathe, including labor, is $18.60 per hour. The variable operating cost of the drill, including labor, is $16.90 per hour. a. . Which design should be adopted if 125,000 units are sold per year? b. What is the annual saving over the other design

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Economics Questions!