Question: Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each. Either design will serve equally well

Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each. Either design will serve equally well and will involve the same material and manufacturing cost except for the lathe and drill operations.
Design A will require 16 hours of lathe time and 4.5 hours of drill time per 1,000 units. Design B will require 7 hours of lathe time and 12 hours of drill time per 1,000 units. The variable operating cost of the lathe, including labor, is $18.60 per hour. The variable operating cost of the drill, including labor, is $16.90 per hour. Finally, there is a sunk cost of $5,000 for Design A and $9,000 for Design B due to obsolete tooling.
a. Which design should be adopted if 125,000 units are sold each year?
b. What is the annual saving over the other design?

Step by Step Solution

3.46 Rating (166 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Strategy Select the design which minimizes total cost ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

929-B-F-R-A (503).docx

120 KBs Word File

Students Have Also Explored These Related Finance Questions!