Question: Equipment cost for a mixed fluid and solids processing is $10,000,000 (includes pressure and materials of construction). This is an expansion to an existing plant.
Equipment cost for a mixed fluid and solids processing is $10,000,000 (includes pressure and materials of construction). This is an expansion to an existing plant.
The following costs apply (for the module cost):
Installation material and labor adds 134% to the purchase cost
Freight, overhead and engineering adds 95% to the purchase cost
Find the Total Module Cost using (1.) Lang factor, and (2) Module cost method
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts