Question: ere M L T = average manufacturing lead time for all parts or products in the plant, ; and the terms Q , n o

ere MLT= average manufacturing lead time for all parts or products in the plant, ; and the terms Q,no,Tsu,Tc, and Tno are all average values for these parameters. mulas to determine these average values are presented in Appendix 3A.
MPLE 3.3 Manufacturing Lead Time
A certain part is produced in batch sizes of 100 units. The batches must be routed through five operations to complete the processing of the parts. A verage setup time is 3.0hrbatch, and average operation time is 6.0minpc. Average nonoperation time is 7.5hr for each operation. Determine the manufacturing lead time to complete one batch, assuming the plant runs 8hr? day, 5 days/wk.
 ere MLT= average manufacturing lead time for all parts or products

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!