Question: estimate using short wall and long wall method ( please solve by hand ) GeneralSpecifications cement mortar ( 1 : 4 ) over lime (
estimate using short wall and long wall method please solve by hand
GeneralSpecifications
cement mortar : over lime
a Foundation and plinth :First class brickwork in
conerete I::
b Saperstructure walls :First class brickwork in cement mortar : over cm
thick D P C:: and parapet walls shall be of cement mortar : I superstructure
cm thick RCC:: band 'lintel shall be provided.
c Roofing : The roof shall be cm thick R C C slab with stone chips :: and
cm av lime terracing :: he R C slabs and beam shall be rcinforced.
d AMl R C C works except roofing shall de reinforced.
e Flooring :Shall be mm thick artificial stone with cement concrete :: with
stone chips finished with neat cement finishing at top. Under fooring shall be : cm thick
Time concrete :: terracing over a brick flat soling.
I Finishing :Outside walls up to plinth including plinth offset shall be mm thick
cement plaster finished smooth with neat cement. Inside and outside walls shall be mm
cment plastered : R C slab and ceiling mm cement plastered : Inside walls
three coats white washed and outside two coats colour washed over a coat of white wash.
g Doors and windows :Frames shall be of Sal wood, shutters of Indian teak wood
Smm thick Indian teak wood panelled type design and shall be painted with two coats over
priming coat. Back of door and window frames shall be painted with two coats of coal tar.
Window gratings shall be mm dia. S bar with mm x mm intermediate stiffer
MS plate and M S clamps for frames mm x mm lat cm long. Iron works shall be
painted two coatsSchedule
JOOR :
INDOW :
RAME
IELF
SECTIONAL ELEYATION ON ABCD
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock