Question: Example 6 The work content for a product assembled on a manual production line is 4 8 min. The work is transported using a continuous

Example 6
The work content for a product assembled on a manual production line is 48min. The work is transported using a continuous overhead conveyor that operates at a speed of 5ftmin. There are 24 workstations on the line, one-third of which have two workers; the remaining stations each have one worker. Repositioning time per worker is 9sec, and uptime efficiency of the line is 95%.(a) What is the maximum possible hourly production rate if the line is assumed to be perfectly balanced? (b) If the actual production rate is only 92% of the maximum possible rate determined in part (a), what is the balance delay on the line?
 Example 6 The work content for a product assembled on a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!