Question: Example 6 The work content for a product assembled on a manual production line is 4 8 min. The work is transported using a continuous
Example
The work content for a product assembled on a manual production line is min. The work is transported using a continuous overhead conveyor that operates at a speed of There are workstations on the line, onethird of which have two workers; the remaining stations each have one worker. Repositioning time per worker is and uptime efficiency of the line is a What is the maximum possible hourly production rate if the line is assumed to be perfectly balanced? b If the actual production rate is only of the maximum possible rate determined in part a what is the balance delay on the line?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
