Question: Total work content for a product assembled on a manual production line is 3 3 . 0 min. Production rate of the line = 4
Total work content for a product assembled on a manual production line is min.
Production rate of the line unitshr Base parts are attached to a moving conveyor
whose speed mmin Repositioning time per worker is sec and line efficiency is
Due to imperfect line balancing, the number of workers needed on the line must be
two more workers than the number required for perfect balance. Manning level
excluding utility workers. Determine the a number of workers and b number of
workstations on the line. c What is the balance efficiency for this line? d If the
workstations are arranged in a line, and the length of each station is m what is the
tolerance time in each station? e What is the elapsed time a work unit spends on the line?
pts
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
