Question: Fill in the Blank: An auditor is testing a control with statistical sampling and determines the expected population deviation rate to be 2% and the
Fill in the Blank: An auditor is testing a control with statistical sampling and determines the expected population deviation rate to be 2% and the tolerable deviation rate to be 7%. The auditor confirms there are 3 deviations found within the sample. What sample size did the auditor choose based on the given information? (enter your answer using numbers and decimal points when appicable). 

10% Risk of Assessing Control Risk Too Low Actual Number of Deviations Found 10% Risk of Assessina Control Risk Too Low