Question: Fill in the Blank: An auditor is testing a control with statistical sampling and determines the expected population deviation rate to be 2% and the


Fill in the Blank: An auditor is testing a control with statistical sampling and determines the expected population deviation rate to be 2% and the tolerable deviation rate to be 7%. The auditor confirms there are 3 deviations found within the sample. What is the achieved upper deviation limit as a result of the testing? (enter your answer in numeric format and include decimals if necessary)
10% Risk of Assessing Control Risk Too Low Actual Number of Deviations Found
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts