Five jobs are waiting for processing through two work centres. Their processing time (in minutes) at each work centre is contained in the table below. Each job requires work centre Alpha before work centre Beta. What is the minimum time for completion of all jobs? Job ER BS DT AU CV Work Centre Alpha Work centre Beta 20 10 25 35 50 20 15 35 55 75 O 165 O 195 O 200 O 175 O 185