Question: Following Table lists the sequence of machine types required for 12 part types and also shows the annual volume of production for each. (a) Set

Following Table lists the sequence of machine types required for 12 part types and also shows the annual volume of production for each. (a) Set up a part machine matrix for the aforementioned data. (b) Assuming the transfer batch size for part types 1, 4, and 5 is 60; part types 2, 3, 6, 10, 11, and 12 is 20; and part types 79 is 50, determine the frequency of trips matrix using the matrix you set up in Following Table lists the sequence of machine types required for 12 part