Question: . For a single sampling plan using ANSI/ASQ Z1.4, code letter C, normal in- spection, and AQL = 25 nonconformities/100 units, the number inspected and

. For a single sampling plan using ANSI/ASQ Z1.4,

. For a single sampling plan using ANSI/ASQ Z1.4, code letter C, normal in- spection, and AQL = 25 nonconformities/100 units, the number inspected and the count of nonconformities for the last 10 lots are 1. 5 0 11. 5 1 III. 5 2 IV. 5 2 V. 51 VI. VII. VIII. IX. X c 5 3 5 1 5 2 5 3 5 1 If production is at a steady rate and reduced inspection is authorized, can a change from normal to reduced inspection be initiated