Question: From the attached table, draw the network 10 points diagram. How long will it take to complete the project? Crash the project until the resources

From the attached table, draw the network 10

From the attached table, draw the network 10 points diagram. How long will it take to complete the project? Crash the project until the resources available for crashing. Activity B D E F G Normal Crash Immdediate time Time Normal Cost Crash Cost predecessor (S) (Weeks) (Weeks) 4 3 2000 2600 2 1 2200 2800 3 3 500 500 A 8 4 2300 2600 B 6 3 900 1200 3 2 3000 4200 DE 4 2 1400 2000