Given A product is assembled on a manual assembly line. The annual demand is 100,000 pieces per year. The total work content is 120 min/pc. The assembly line has one worker per station and will operate 50 weeks per year, 2 shifts per day, 5 days per week, 8 hours per shift, and the line efficiency is 90%. Find A. Determine the average hourly production rate in pc/hr. B. Determine the cycle time in min/pc. C. Determine the ideal minimum number of workstations