Question: Given the following project information: Optimistic Most Likely Pessimistic Immediate Time Time Time Activity Predecessor(s) (weeks) (weeks) (weeks) A 3 6 9 B A 3

Given the following project information:

Given the following project information: Optimistic Most Likely Pessimistic Immediate Time Time Time Activity Predecessor(s) (weeks) (weeks) (weeks) A 3 6 9 B A 3 5 7 A 8 7 12 D B 2 6 10 E 5 10 15 F D. E 3 4 5 G DE 4 6 8 H F 3 5 7 I G 5 8 11 J HI 3 3 3 UA Oo un mnm a) Determine the estimated time for each task using the PERT formula. b) Draw an Activity-on-Arrow Diagram for the project. Include all information on nodes. c) Determine ALL Project paths. Determine the critical path for this project