Question: Given: - the sheet - pile soil system shown in Figure 2 , where L 1 = 1 . 5 m and L 2 =

Given:
- the sheet-pile soil system shown in Figure 2, where L1=1.5m and L2=3m
for the sand:
-'=33
-=16.5kNm3
-sat=19.0kNm3
for the clay:
-c=50kNm2=0, and y_sat=20 kn/m^3.
Determine the required depth of embedment of the sheet pile, allowing for a 50% increase from the theoretical estimate. (Figure 2 is attached)