Question: Hello, please help me solve this problem. Here is the complete question below. I need help with this as soon as possible. Bill of Material
Hello, please help me solve this problem. Here is the complete question below. I need help with this as soon as possible.

Bill of Material for Office Table Table Final Assembly Top Assembly Support Assembly (1 required) (1 required) Bracket Wood Screw Center Support Side Support (6 required) (48 required) (1 required) (2 required) MS.53 An office furniture manufacturer needs to calculate material requirements for one of its most popular tables. The graphic above shows the bill of material for this item. Below are the MRP tables for the top-level assembly (the Office Table Final Assembly) and one of its sub-assemblies (the Table-Top Assembly): Office Table Final Assembly 8/1 8/8 8/15 8/22 8/29 9/5 9/12 9/19 9/26 Gross Requirements 400 200 600 600 300 200 Scheduled Receipts Projected On-Hand Inv. 380 Net Requirements Planned Order Receipts Planned Order Releases Lead Time (in weeks Lot Size 75 Table-Top Assembly 8/1 8/8 8/15 8/22 8/29 9/5 9/12 9/19 9/26 Gross Requirements Scheduled Receipt 170 Projected On-Hand Inv. 70 Net Requirements Planned Order Rec Planned Order Releases Lead Time (in weeks 2 Lot Size 10 For the Office Table above (the first MRP table), what is the Projected On-Hand Inventory in the week of 9/19? Number For the Office Table above, what are the Planned Order Receipts in the week of 8/8? Number For the Table-Top Assembly above, what are the Net Requirements in the week of 9/19? Number For the Table-Top Assembly above, what are the Planned Order Releases in the week of 9/5? Number
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
