Question: Help Save & Exit Problem 7-1 (Algo) An analyst has timed a metal-cutting operation for 50 cycles. The average time per cycle was 8.6

Help Save & Exit Problem 7-1 (Algo) An analyst has timed a metal-cutting operation for 50 cycles. The average time per cycle was 8.6 minutes, and the standard deviation was 1.06 minutes for a worker with a performance rating of 106 percent. Assume an allowance of 6 percent of job time. Find the standard time for this operation. (Do not round intermediate calculations. Round your final answer to 2 decimal places.) Standard time minutes Check