Question: help with this on the inductrial project design title: REDUCING DOWNTIME BETWEEN WAREHOUSE AND PRODUCTION LINE BY IMPROVING MATERIAL PICKING PROCESS, I WILL INTRODUCE GSI
help with this on the inductrial project design title: REDUCING DOWNTIME BETWEEN WAREHOUSE AND PRODUCTION LINE BY IMPROVING MATERIAL PICKING PROCESS, I WILL INTRODUCE GSI SYSTEM WHICH WILL FORM A PART OF IMPROVING PROCESS Problem Identification: Clearly define the problem with the material picking process and identify the root causes of downtime between the warehouse and production line. Design: Based on the identified problems, design and develop a comprehensive solution that incorporates the GSI system to improve material picking processes. Implementation: Implement the designed solution by integrating the GSI system within the current material picking process. Ensure that all stakeholders are involved in the implementation process and have adequate training on the new system. Data Collection: Collect relevant data to measure and evaluate the effectiveness of the GSI system in reducing downtime. This can be done through analysis of process data, realtime machine data, and user feedback. Analysis: Analyze the collected data using appropriate techniques to evaluate the impact of the GSI system on downtime and other related metrics. Validation: Validate the results obtained from the analysis through a pilot test in realworld conditions and obtain feedback from stakeholders. Refinement: Refine any areas of the solution that did not achieve the desired outcomes through a continuous improvement process.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
