Question: Hi i need it done by hand not using a software thanks Draw the Gantt Chart and calculate the Direct Flexibility of each activity shown

Hi i need it done by hand not using a software thanks
Draw the Gantt Chart and calculate the Direct Flexibility of each activity shown in the below table: IPA Activity Duration (days) 2 3 4 A A 3 B E 6 B,C C,D 5 UW UI-Y 4 E 3 F 5 5 3 F HI J Submission Procedure: 1) Draw the Gantt chart on a paper, then calculate the Direct Flexibility of each Activity, then scanStep by Step Solution