Question: Hi please help me find the missing numbers marked with X. Thanks Goal Programming Mackenzie owns a custom watch company, which has several different types

Hi please help me find the missing numbers marked with X.
Thanks
Goal Programming Mackenzie owns a custom watch company, which has several different types of watches that she and her team manufacture from raw materials. Below is a table with the watch characteristics and descriptions. X1 Diver - Automatic $310.00 X2 X3 X4 X5 | High- Aviator Chronograph Sports Impact $270.00 $295.00 $200.00 $170.00 X6 X7 Casual Luxury $100.00 $320.00 X 67 XoWXX Profit per watch Pressure- Tested Battery Internal Gears Knobs Hands Leather Band Stainless Steel Band Rubber Band Steel (lbs) Aluminum (lbs) General Labor Hours Embellishment Hours Inspection Hours Impact Resistant Rotating Bezel 0.35 0.25 3 8 0.5 1 0 .5 3.5 0.15 0.25 0.3 0.65 x x Goal Programming - Part 1 Formulate a linear program to maximize profit per week with the following constraints: . The pressure-testing equipment can only handle 40 tests per week. Mackenzie's supply chain restricts the availability of parts to 40 watch batteries, 2400 internal gears, 120 knobs, 200 hands, 25 leather bands, 35 stainless steel bands, 15 rubber bands, 20 pounds of steel, and 8 pounds of aluminum each week. General Labor is limited to 270 hours per week; Embellishment labor is limited to 80 hours per week, and Inspection Hours are limited to 25 per week. At least 32 watches must be impact resistant. . At least 15 of the watches must have a rotating bezel. . Each watch must have a minimum of 5 manufactured per week. Goal Programming Mackenzie owns a custom watch company, which has several different types of watches that she and her team manufacture from raw materials. Below is a table with the watch characteristics and descriptions. X1 Diver - Automatic $310.00 X2 X3 X4 X5 | High- Aviator Chronograph Sports Impact $270.00 $295.00 $200.00 $170.00 X6 X7 Casual Luxury $100.00 $320.00 X 67 XoWXX Profit per watch Pressure- Tested Battery Internal Gears Knobs Hands Leather Band Stainless Steel Band Rubber Band Steel (lbs) Aluminum (lbs) General Labor Hours Embellishment Hours Inspection Hours Impact Resistant Rotating Bezel 0.35 0.25 3 8 0.5 1 0 .5 3.5 0.15 0.25 0.3 0.65 x x Goal Programming - Part 1 Formulate a linear program to maximize profit per week with the following constraints: . The pressure-testing equipment can only handle 40 tests per week. Mackenzie's supply chain restricts the availability of parts to 40 watch batteries, 2400 internal gears, 120 knobs, 200 hands, 25 leather bands, 35 stainless steel bands, 15 rubber bands, 20 pounds of steel, and 8 pounds of aluminum each week. General Labor is limited to 270 hours per week; Embellishment labor is limited to 80 hours per week, and Inspection Hours are limited to 25 per week. At least 32 watches must be impact resistant. . At least 15 of the watches must have a rotating bezel. . Each watch must have a minimum of 5 manufactured per weekStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock