Question: Hide Assignment Information Instructions LH - RH Chart: 1 ) Consider assembling bolts with washers and nuts as given in the following layout diagram. (
Hide Assignment Information
Instructions
LHRH Chart:
Consider assembling bolts with washers and nuts as given in the following layout diagram.
a Draw LHRH chart of the assembly process using the above given bench layout. Left hand picks up one bolt, brings to center and holds, while the right hand picks up the parts from the other bins, assembles each item on the bolt and finally the right hand disposes off the assembly in the finished assembly bin.
b Improve upon the above layout and draw a revised LHRH chart.
Flow Process Chart
Consider the process of assembling drawers. Three drawerclamp machines put the drawer together by pressing the dovetails in the drawer sides into the slots in the drawer fronts and backs. The drawer subassembly is then placed on a roller line and transported to a stop, where it waits to be placed on a motorized conveyor line. On the conveyor line, the bottom of the drawer is stapled on drawer guides are installed, and glue blocks are added. The drawers encounter another stop until one of two sanding operators remove them from the conveyor line. The dovetail joints are then sanded on a belt sander and loaded onto a hanger conveyor. The hanger conveyor transports the drawer through a spray booth, where the finish is applied. The finished drawer then winds its way to the chest assembly area, by which time the finish has dried.
a Construct a Flow Process Chart for the above process.
b Create an improved method for accomplishing the process. Construct a revised Flow Process Chart to show the improved method and a revised Flow Diagram.
Current process Flow Diagram
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock