Question: i cannot figure which answer i got wrong. It seems like 2 answers are incorrect Question 11 0.78 / 1 pts Tammy is applying for
i cannot figure which answer i got wrong. It seems like 2 answers are incorrect




Question 11 0.78 / 1 pts Tammy is applying for a production supervisory position at the imao Bakeries local operating division. Bimbo is a global learer in the bakery industry, and he had an interview with the HR VE Ms. Harlop. She wanted to know a bit more about Tommy's qualifications Tommy got nyreno sperd a day on the producten oar in Horsham PA They were running may product that day, and the line foreman, Michael Tasked Tommy if ther production lines in control Aspecial whole grain dinner rol was on the day's schedule Tommy collected random samples and weighed them from 6 om on. Every hour he colecred 5 random rolls at various conveying belt locations. Over the 5 hours 15 am to 12 pm. The data collected are shown beow. Hours Sampla # 1 Samnis #2 Sample #3 Sample 4 Sample 3 am 6.5 3.9 5.8 3.2 67 5.5 8.4 5.9 5.8 5.5 aam 7.7 7.0 8.9 80 9 am Ei 4 ! 10 am i ! 6. 61 59 57 : 11 7.8 7.7 7.5 8.1 7.3 Wat is the sample size, n-? Select Total samples Tommy colecten Seleci) Wat is the Upper Control Lirnil for weyil xbul Eclect What is the Lower Control Limit for weght x bar Select What is ita Upper Control mil Morrone, R TETT Walish Lower Contul Linnil for range, Sciach Is the process under control How many points out of control Select Is Rarga char in control Select Answer 1: Answer 2: Answer 3: 7.10 Answer 4: 6.95 Answer 5: 2.12 Answer 6: 00 Answer 7: NO Answer 8: 2 Answer: : No Tommy is applying for a production supervisory position at the Bimbo Bakeries local operating division. Bimbo is a global leader in the bakery industry, and he had an interview with the HR VP, Ms. Harlop. She wanted to know a bit more about Tommy's qualifications. Tommy got invited to spend a day on the production floor in Horsham, PA. They were running a key product that day, and the line foreman, Michael T. asked Tommy if their production line is in control. A special whole grain dinner roll was on the day's schedule. Tommy collected random samples and weighed them, from 6 am on. Every hour he collected 5 random rolls, at various conveying belt locations. Over the 6 hours (6 am to 12 pm). The data collected are shown below. Hours Sample Sample Sample Sample Sample # 1 #2 # 3 #4 # 5 Sample Sample 6 am 6.5 5.9 5.8 6.2 6.7 7 am 5.5 6.4 5.9 5.8 5.5 8 am 7.7 6.3 7.0 6.9 6.0 9 am 6.4 5.9 5.8 6.5 6.7 10 am 6.5 6.1 6.7 5.9 6.7 11 am 17.9 7.7 7.5 8.1 7.3 What is the sample size, n = ? (Select ] What is the sample size, n = ? [Select] > Total samples Tommy collected [Select ] > What is the Upper Control Limit for weight, x-bar (Select] > What is the Lower Control Limit for weight, x -bar [Select] > What is the Upper Control Limit for range, R (Select ] What is the Lower Control Limit for range, R [Select ] >