Question: (i) Develop the best schedule that will minimize the makespan of the five jobs. (ii) Illustrate the time phased flow of job sequence (iii) Determine
(i) Develop the best schedule that will minimize the makespan of the five jobs. (ii) Illustrate the time phased flow of job sequence (iii) Determine idle time for each work centre (iv) Determine job waiting time
*PLS DONT SOLVE BY HAND-WRITING* U MAY USE WORD/TYPE,


Tutorial Johnson's Rule (Three machine) Time (hr) Motor WC1 WC2 WC3 M1 M2 M3 M4 M5 17 9 23 15 21 3 5 8 2 6 2 4 5 1 3 Tutorial Johnson's Rule at the Morris Machine Co. Time (hr) Motor Workstation 1 Workstation 2 M1 M2 M3 M4 M5 12 4 5 15 10 22 5 3 16 8